Steam-Generators Replacement at the Krško Nuclear Power Plant

2009 Ogledov
1280 Prenosov
Izvoz citacije: ABNT
CERJAK, Janko ;ANDROJNA, Andrej ;VOLARIČ, Bojan .
Steam-Generators Replacement at the Krško Nuclear Power Plant. 
Strojniški vestnik - Journal of Mechanical Engineering, [S.l.], v. 46, n.3, p. 192-203, july 2017. 
ISSN 0039-2480.
Available at: <https://www.sv-jme.eu/sl/article/steam-generators-replacement-at-the-krsko-nuclear-power-plant/>. Date accessed: 19 nov. 2024. 
doi:http://dx.doi.org/.
Cerjak, J., Androjna, A., & Volarič, B.
(2000).
Steam-Generators Replacement at the Krško Nuclear Power Plant.
Strojniški vestnik - Journal of Mechanical Engineering, 46(3), 192-203.
doi:http://dx.doi.org/
@article{.,
	author = {Janko  Cerjak and Andrej  Androjna and Bojan  Volarič},
	title = {Steam-Generators Replacement at the Krško Nuclear Power Plant},
	journal = {Strojniški vestnik - Journal of Mechanical Engineering},
	volume = {46},
	number = {3},
	year = {2000},
	keywords = {transport; lifting systems; optical survey; decontamination; },
	abstract = {The paper covers all the basic techniques of the steam-generator replacement (SGR) project including all rigging /handling and other logistical activities as well as all the permanent modifications required to adapt systems for the new steam generators and the corresponding power increase. All activities will be performed in a way which ensures that the following main project goals will be met: 1. all work will be done within contractual obligations; 2. collective dose below 1.4manSv; 3. zero lost working days due to personal injury},
	issn = {0039-2480},	pages = {192-203},	doi = {},
	url = {https://www.sv-jme.eu/sl/article/steam-generators-replacement-at-the-krsko-nuclear-power-plant/}
}
Cerjak, J.,Androjna, A.,Volarič, B.
2000 July 46. Steam-Generators Replacement at the Krško Nuclear Power Plant. Strojniški vestnik - Journal of Mechanical Engineering. [Online] 46:3
%A Cerjak, Janko 
%A Androjna, Andrej 
%A Volarič, Bojan 
%D 2000
%T Steam-Generators Replacement at the Krško Nuclear Power Plant
%B 2000
%9 transport; lifting systems; optical survey; decontamination; 
%! Steam-Generators Replacement at the Krško Nuclear Power Plant
%K transport; lifting systems; optical survey; decontamination; 
%X The paper covers all the basic techniques of the steam-generator replacement (SGR) project including all rigging /handling and other logistical activities as well as all the permanent modifications required to adapt systems for the new steam generators and the corresponding power increase. All activities will be performed in a way which ensures that the following main project goals will be met: 1. all work will be done within contractual obligations; 2. collective dose below 1.4manSv; 3. zero lost working days due to personal injury
%U https://www.sv-jme.eu/sl/article/steam-generators-replacement-at-the-krsko-nuclear-power-plant/
%0 Journal Article
%R 
%& 192
%P 12
%J Strojniški vestnik - Journal of Mechanical Engineering
%V 46
%N 3
%@ 0039-2480
%8 2017-07-07
%7 2017-07-07
Cerjak, Janko, Andrej  Androjna, & Bojan  Volarič.
"Steam-Generators Replacement at the Krško Nuclear Power Plant." Strojniški vestnik - Journal of Mechanical Engineering [Online], 46.3 (2000): 192-203. Web.  19 Nov. 2024
TY  - JOUR
AU  - Cerjak, Janko 
AU  - Androjna, Andrej 
AU  - Volarič, Bojan 
PY  - 2000
TI  - Steam-Generators Replacement at the Krško Nuclear Power Plant
JF  - Strojniški vestnik - Journal of Mechanical Engineering
DO  - 
KW  - transport; lifting systems; optical survey; decontamination; 
N2  - The paper covers all the basic techniques of the steam-generator replacement (SGR) project including all rigging /handling and other logistical activities as well as all the permanent modifications required to adapt systems for the new steam generators and the corresponding power increase. All activities will be performed in a way which ensures that the following main project goals will be met: 1. all work will be done within contractual obligations; 2. collective dose below 1.4manSv; 3. zero lost working days due to personal injury
UR  - https://www.sv-jme.eu/sl/article/steam-generators-replacement-at-the-krsko-nuclear-power-plant/
@article{{}{.},
	author = {Cerjak, J., Androjna, A., Volarič, B.},
	title = {Steam-Generators Replacement at the Krško Nuclear Power Plant},
	journal = {Strojniški vestnik - Journal of Mechanical Engineering},
	volume = {46},
	number = {3},
	year = {2000},
	doi = {},
	url = {https://www.sv-jme.eu/sl/article/steam-generators-replacement-at-the-krsko-nuclear-power-plant/}
}
TY  - JOUR
AU  - Cerjak, Janko 
AU  - Androjna, Andrej 
AU  - Volarič, Bojan 
PY  - 2017/07/07
TI  - Steam-Generators Replacement at the Krško Nuclear Power Plant
JF  - Strojniški vestnik - Journal of Mechanical Engineering; Vol 46, No 3 (2000): Strojniški vestnik - Journal of Mechanical Engineering
DO  - 
KW  - transport, lifting systems, optical survey, decontamination, 
N2  - The paper covers all the basic techniques of the steam-generator replacement (SGR) project including all rigging /handling and other logistical activities as well as all the permanent modifications required to adapt systems for the new steam generators and the corresponding power increase. All activities will be performed in a way which ensures that the following main project goals will be met: 1. all work will be done within contractual obligations; 2. collective dose below 1.4manSv; 3. zero lost working days due to personal injury
UR  - https://www.sv-jme.eu/sl/article/steam-generators-replacement-at-the-krsko-nuclear-power-plant/
Cerjak, Janko, Androjna, Andrej, AND Volarič, Bojan.
"Steam-Generators Replacement at the Krško Nuclear Power Plant" Strojniški vestnik - Journal of Mechanical Engineering [Online], Volume 46 Number 3 (07 July 2017)

Avtorji

Inštitucije

  • Nuclear Power Plant Krško, Slovenia
  • Nuclear Power Plant Krško, Slovenia
  • Nuclear Power Plant Krško, Slovenia

Informacije o papirju

Strojniški vestnik - Journal of Mechanical Engineering 46(2000)3, 192-203
© The Authors, CC-BY 4.0 Int. Change in copyright policy from 2022, Jan 1st.

The paper covers all the basic techniques of the steam-generator replacement (SGR) project including all rigging /handling and other logistical activities as well as all the permanent modifications required to adapt systems for the new steam generators and the corresponding power increase. All activities will be performed in a way which ensures that the following main project goals will be met: 1. all work will be done within contractual obligations; 2. collective dose below 1.4manSv; 3. zero lost working days due to personal injury

transport; lifting systems; optical survey; decontamination;