Reduction of Machine Setup Time

2071 Views
2855 Downloads
Export citation: ABNT
KUŠAR, Janez ;BERLEC, Tomaž ;ŽEFRAN, Ferdinand ;STARBEK, Marko .
Reduction of Machine Setup Time. 
Strojniški vestnik - Journal of Mechanical Engineering, [S.l.], v. 56, n.12, p. 833-845, october 2017. 
ISSN 0039-2480.
Available at: <https://www.sv-jme.eu/article/reduction-of-machine-setup-time/>. Date accessed: 19 nov. 2024. 
doi:http://dx.doi.org/.
Kušar, J., Berlec, T., Žefran, F., & Starbek, M.
(2010).
Reduction of Machine Setup Time.
Strojniški vestnik - Journal of Mechanical Engineering, 56(12), 833-845.
doi:http://dx.doi.org/
@article{.,
	author = {Janez  Kušar and Tomaž  Berlec and Ferdinand  Žefran and Marko  Starbek},
	title = {Reduction of Machine Setup Time},
	journal = {Strojniški vestnik - Journal of Mechanical Engineering},
	volume = {56},
	number = {12},
	year = {2010},
	keywords = {machine setup time; SMED workshop; continuous improvement; teamwork; microelements; },
	abstract = {Customers today require smaller series of products. In manufacturing companies, this increases machine setup time, which is a waste. This paper presents a procedure for organizing and implementing a reduction of machine setup time. It is based on teamwork and uses the SMED method, which allows a gradual reduction of machine setup time to less than 10 minutes, and a continuous improvement system. The paper also presents the results of the organization and execution of a SMED workshop for the reduction of setup times in a jet machine, as well as first suggestions for improvements that should significantly reduce machine setup time.},
	issn = {0039-2480},	pages = {833-845},	doi = {},
	url = {https://www.sv-jme.eu/article/reduction-of-machine-setup-time/}
}
Kušar, J.,Berlec, T.,Žefran, F.,Starbek, M.
2010 October 56. Reduction of Machine Setup Time. Strojniški vestnik - Journal of Mechanical Engineering. [Online] 56:12
%A Kušar, Janez 
%A Berlec, Tomaž 
%A Žefran, Ferdinand 
%A Starbek, Marko 
%D 2010
%T Reduction of Machine Setup Time
%B 2010
%9 machine setup time; SMED workshop; continuous improvement; teamwork; microelements; 
%! Reduction of Machine Setup Time
%K machine setup time; SMED workshop; continuous improvement; teamwork; microelements; 
%X Customers today require smaller series of products. In manufacturing companies, this increases machine setup time, which is a waste. This paper presents a procedure for organizing and implementing a reduction of machine setup time. It is based on teamwork and uses the SMED method, which allows a gradual reduction of machine setup time to less than 10 minutes, and a continuous improvement system. The paper also presents the results of the organization and execution of a SMED workshop for the reduction of setup times in a jet machine, as well as first suggestions for improvements that should significantly reduce machine setup time.
%U https://www.sv-jme.eu/article/reduction-of-machine-setup-time/
%0 Journal Article
%R 
%& 833
%P 13
%J Strojniški vestnik - Journal of Mechanical Engineering
%V 56
%N 12
%@ 0039-2480
%8 2017-10-24
%7 2017-10-24
Kušar, Janez, Tomaž  Berlec, Ferdinand  Žefran, & Marko  Starbek.
"Reduction of Machine Setup Time." Strojniški vestnik - Journal of Mechanical Engineering [Online], 56.12 (2010): 833-845. Web.  19 Nov. 2024
TY  - JOUR
AU  - Kušar, Janez 
AU  - Berlec, Tomaž 
AU  - Žefran, Ferdinand 
AU  - Starbek, Marko 
PY  - 2010
TI  - Reduction of Machine Setup Time
JF  - Strojniški vestnik - Journal of Mechanical Engineering
DO  - 
KW  - machine setup time; SMED workshop; continuous improvement; teamwork; microelements; 
N2  - Customers today require smaller series of products. In manufacturing companies, this increases machine setup time, which is a waste. This paper presents a procedure for organizing and implementing a reduction of machine setup time. It is based on teamwork and uses the SMED method, which allows a gradual reduction of machine setup time to less than 10 minutes, and a continuous improvement system. The paper also presents the results of the organization and execution of a SMED workshop for the reduction of setup times in a jet machine, as well as first suggestions for improvements that should significantly reduce machine setup time.
UR  - https://www.sv-jme.eu/article/reduction-of-machine-setup-time/
@article{{}{.},
	author = {Kušar, J., Berlec, T., Žefran, F., Starbek, M.},
	title = {Reduction of Machine Setup Time},
	journal = {Strojniški vestnik - Journal of Mechanical Engineering},
	volume = {56},
	number = {12},
	year = {2010},
	doi = {},
	url = {https://www.sv-jme.eu/article/reduction-of-machine-setup-time/}
}
TY  - JOUR
AU  - Kušar, Janez 
AU  - Berlec, Tomaž 
AU  - Žefran, Ferdinand 
AU  - Starbek, Marko 
PY  - 2017/10/24
TI  - Reduction of Machine Setup Time
JF  - Strojniški vestnik - Journal of Mechanical Engineering; Vol 56, No 12 (2010): Strojniški vestnik - Journal of Mechanical Engineering
DO  - 
KW  - machine setup time, SMED workshop, continuous improvement, teamwork, microelements, 
N2  - Customers today require smaller series of products. In manufacturing companies, this increases machine setup time, which is a waste. This paper presents a procedure for organizing and implementing a reduction of machine setup time. It is based on teamwork and uses the SMED method, which allows a gradual reduction of machine setup time to less than 10 minutes, and a continuous improvement system. The paper also presents the results of the organization and execution of a SMED workshop for the reduction of setup times in a jet machine, as well as first suggestions for improvements that should significantly reduce machine setup time.
UR  - https://www.sv-jme.eu/article/reduction-of-machine-setup-time/
Kušar, Janez, Berlec, Tomaž, Žefran, Ferdinand, AND Starbek, Marko.
"Reduction of Machine Setup Time" Strojniški vestnik - Journal of Mechanical Engineering [Online], Volume 56 Number 12 (24 October 2017)

Authors

Affiliations

  • University of Ljubljana, Faculty of Mechanical Engineering, Slovenia
  • University of Ljubljana, Faculty of Mechanical Engineering, Slovenia
  • University of Ljubljana, Faculty of Mechanical Engineering, Slovenia
  • University of Ljubljana, Faculty of Mechanical Engineering, Slovenia

Paper's information

Strojniški vestnik - Journal of Mechanical Engineering 56(2010)12, 833-845
© The Authors, CC-BY 4.0 Int. Change in copyright policy from 2022, Jan 1st.

Customers today require smaller series of products. In manufacturing companies, this increases machine setup time, which is a waste. This paper presents a procedure for organizing and implementing a reduction of machine setup time. It is based on teamwork and uses the SMED method, which allows a gradual reduction of machine setup time to less than 10 minutes, and a continuous improvement system. The paper also presents the results of the organization and execution of a SMED workshop for the reduction of setup times in a jet machine, as well as first suggestions for improvements that should significantly reduce machine setup time.

machine setup time; SMED workshop; continuous improvement; teamwork; microelements;