Continuous improvements in die-casting using a Six Sigma approach

2026 Views
1215 Downloads
Export citation: ABNT
PAVLETIĆ, Duško ;SOKOVIĆ, Mirko ;MAUROVIĆ, Daniel .
Continuous improvements in die-casting using a Six Sigma approach. 
Strojniški vestnik - Journal of Mechanical Engineering, [S.l.], v. 53, n.11, p. 794-801, august 2017. 
ISSN 0039-2480.
Available at: <https://www.sv-jme.eu/article/continuous-improvements-in-die-casting-using-a-six-sigma-approach/>. Date accessed: 19 nov. 2024. 
doi:http://dx.doi.org/.
Pavletić, D., Soković, M., & Maurović, D.
(2007).
Continuous improvements in die-casting using a Six Sigma approach.
Strojniški vestnik - Journal of Mechanical Engineering, 53(11), 794-801.
doi:http://dx.doi.org/
@article{.,
	author = {Duško  Pavletić and Mirko  Soković and Daniel  Maurović},
	title = {Continuous improvements in die-casting using a Six Sigma approach},
	journal = {Strojniški vestnik - Journal of Mechanical Engineering},
	volume = {53},
	number = {11},
	year = {2007},
	keywords = {Six Sigma; die-casting; aluminium; continuous improvements; },
	abstract = {This paper deals with the application of a Six Sigma methodology to the continuous improvement of an aluminium die-casting process. A Six Sigma improvement project was initiated in an aluminium die-casting process, with the aim to reduce the amount of machining scrap from an average of 4.12% to less than 2%, and the amount of material scrap from 11.43% to an average of less than 4%. The parameters with a major influence on the level of scrap were defined in a cause-and-effect diagram, analyzed, improved where necessary, and put under control using Six Sigma tools and methods. Although the initial project goals were not completely met, major die-casting process improvements were made, resulting in significant savings.},
	issn = {0039-2480},	pages = {794-801},	doi = {},
	url = {https://www.sv-jme.eu/article/continuous-improvements-in-die-casting-using-a-six-sigma-approach/}
}
Pavletić, D.,Soković, M.,Maurović, D.
2007 August 53. Continuous improvements in die-casting using a Six Sigma approach. Strojniški vestnik - Journal of Mechanical Engineering. [Online] 53:11
%A Pavletić, Duško 
%A Soković, Mirko 
%A Maurović, Daniel 
%D 2007
%T Continuous improvements in die-casting using a Six Sigma approach
%B 2007
%9 Six Sigma; die-casting; aluminium; continuous improvements; 
%! Continuous improvements in die-casting using a Six Sigma approach
%K Six Sigma; die-casting; aluminium; continuous improvements; 
%X This paper deals with the application of a Six Sigma methodology to the continuous improvement of an aluminium die-casting process. A Six Sigma improvement project was initiated in an aluminium die-casting process, with the aim to reduce the amount of machining scrap from an average of 4.12% to less than 2%, and the amount of material scrap from 11.43% to an average of less than 4%. The parameters with a major influence on the level of scrap were defined in a cause-and-effect diagram, analyzed, improved where necessary, and put under control using Six Sigma tools and methods. Although the initial project goals were not completely met, major die-casting process improvements were made, resulting in significant savings.
%U https://www.sv-jme.eu/article/continuous-improvements-in-die-casting-using-a-six-sigma-approach/
%0 Journal Article
%R 
%& 794
%P 8
%J Strojniški vestnik - Journal of Mechanical Engineering
%V 53
%N 11
%@ 0039-2480
%8 2017-08-18
%7 2017-08-18
Pavletić, Duško, Mirko  Soković, & Daniel  Maurović.
"Continuous improvements in die-casting using a Six Sigma approach." Strojniški vestnik - Journal of Mechanical Engineering [Online], 53.11 (2007): 794-801. Web.  19 Nov. 2024
TY  - JOUR
AU  - Pavletić, Duško 
AU  - Soković, Mirko 
AU  - Maurović, Daniel 
PY  - 2007
TI  - Continuous improvements in die-casting using a Six Sigma approach
JF  - Strojniški vestnik - Journal of Mechanical Engineering
DO  - 
KW  - Six Sigma; die-casting; aluminium; continuous improvements; 
N2  - This paper deals with the application of a Six Sigma methodology to the continuous improvement of an aluminium die-casting process. A Six Sigma improvement project was initiated in an aluminium die-casting process, with the aim to reduce the amount of machining scrap from an average of 4.12% to less than 2%, and the amount of material scrap from 11.43% to an average of less than 4%. The parameters with a major influence on the level of scrap were defined in a cause-and-effect diagram, analyzed, improved where necessary, and put under control using Six Sigma tools and methods. Although the initial project goals were not completely met, major die-casting process improvements were made, resulting in significant savings.
UR  - https://www.sv-jme.eu/article/continuous-improvements-in-die-casting-using-a-six-sigma-approach/
@article{{}{.},
	author = {Pavletić, D., Soković, M., Maurović, D.},
	title = {Continuous improvements in die-casting using a Six Sigma approach},
	journal = {Strojniški vestnik - Journal of Mechanical Engineering},
	volume = {53},
	number = {11},
	year = {2007},
	doi = {},
	url = {https://www.sv-jme.eu/article/continuous-improvements-in-die-casting-using-a-six-sigma-approach/}
}
TY  - JOUR
AU  - Pavletić, Duško 
AU  - Soković, Mirko 
AU  - Maurović, Daniel 
PY  - 2017/08/18
TI  - Continuous improvements in die-casting using a Six Sigma approach
JF  - Strojniški vestnik - Journal of Mechanical Engineering; Vol 53, No 11 (2007): Strojniški vestnik - Journal of Mechanical Engineering
DO  - 
KW  - Six Sigma, die-casting, aluminium, continuous improvements, 
N2  - This paper deals with the application of a Six Sigma methodology to the continuous improvement of an aluminium die-casting process. A Six Sigma improvement project was initiated in an aluminium die-casting process, with the aim to reduce the amount of machining scrap from an average of 4.12% to less than 2%, and the amount of material scrap from 11.43% to an average of less than 4%. The parameters with a major influence on the level of scrap were defined in a cause-and-effect diagram, analyzed, improved where necessary, and put under control using Six Sigma tools and methods. Although the initial project goals were not completely met, major die-casting process improvements were made, resulting in significant savings.
UR  - https://www.sv-jme.eu/article/continuous-improvements-in-die-casting-using-a-six-sigma-approach/
Pavletić, Duško, Soković, Mirko, AND Maurović, Daniel.
"Continuous improvements in die-casting using a Six Sigma approach" Strojniški vestnik - Journal of Mechanical Engineering [Online], Volume 53 Number 11 (18 August 2017)

Authors

Affiliations

  • University of Rijeka, Faculty of Engineering, Croatia
  • University of Ljubljana, Faculty of Mechanical Engineering, Slovenia
  • PS CIMOS - PCC d.o.o., Croatia

Paper's information

Strojniški vestnik - Journal of Mechanical Engineering 53(2007)11, 794-801
© The Authors, CC-BY 4.0 Int. Change in copyright policy from 2022, Jan 1st.

This paper deals with the application of a Six Sigma methodology to the continuous improvement of an aluminium die-casting process. A Six Sigma improvement project was initiated in an aluminium die-casting process, with the aim to reduce the amount of machining scrap from an average of 4.12% to less than 2%, and the amount of material scrap from 11.43% to an average of less than 4%. The parameters with a major influence on the level of scrap were defined in a cause-and-effect diagram, analyzed, improved where necessary, and put under control using Six Sigma tools and methods. Although the initial project goals were not completely met, major die-casting process improvements were made, resulting in significant savings.

Six Sigma; die-casting; aluminium; continuous improvements;