SEMOLIČ, Brane ;JOVANOVIĆ, Petar ;OBRADOVIĆ, Vladimir ;KOVAČEV, Sava . Improving repair management of bucket wheel excavator SRs1200 by application of project management concept. Strojniški vestnik - Journal of Mechanical Engineering, [S.l.], v. 54, n.7-8, p. 565-573, august 2017. ISSN 0039-2480. Available at: <https://www.sv-jme.eu/article/improving-repair-management-of-bucket-wheel-excavator-srs1200-by-application-of-project-management-concept/>. Date accessed: 20 dec. 2024. doi:http://dx.doi.org/.
Semolič, B., Jovanović, P., Obradović, V., & Kovačev, S. (2008). Improving repair management of bucket wheel excavator SRs1200 by application of project management concept. Strojniški vestnik - Journal of Mechanical Engineering, 54(7-8), 565-573. doi:http://dx.doi.org/
@article{., author = {Brane Semolič and Petar Jovanović and Vladimir Obradović and Sava Kovačev}, title = {Improving repair management of bucket wheel excavator SRs1200 by application of project management concept}, journal = {Strojniški vestnik - Journal of Mechanical Engineering}, volume = {54}, number = {7-8}, year = {2008}, keywords = {bucket wheel excavators; maintance management; repair management; project management; }, abstract = {The losses resulting from the defect or breakdown of equipment amount to incredible sums, often far higher than the cost of maintenance, repair or reconstruction. It is for this reason that a large number of methods for maintenance and repair of industrial and other plants have been developed. Elaborated in much detail, these methods nevertheless leave a lot of space forimprovement. The improvement is primarily viewed in the context of the management of time, resources and costs of such enterprises. This paper presents a certain concept of project management the implementation of which may improve the maintenance and repair projects. The concept was tested in practice and confirmed in the project of revitalizing of the bucket wheel excavator SRs1200 at MB Kolubara, one of the most complex projects of the kindin the region recently, in terms of technical complexity of reconstruction, the number of participants, the number of activities, cost andtime of realization, as well as other elements of the project. The application of this concept allowed for achieving significant results in the technical and financial fields, which will further be analyzed in detail.}, issn = {0039-2480}, pages = {565-573}, doi = {}, url = {https://www.sv-jme.eu/article/improving-repair-management-of-bucket-wheel-excavator-srs1200-by-application-of-project-management-concept/} }
Semolič, B.,Jovanović, P.,Obradović, V.,Kovačev, S. 2008 August 54. Improving repair management of bucket wheel excavator SRs1200 by application of project management concept. Strojniški vestnik - Journal of Mechanical Engineering. [Online] 54:7-8
%A Semolič, Brane %A Jovanović, Petar %A Obradović, Vladimir %A Kovačev, Sava %D 2008 %T Improving repair management of bucket wheel excavator SRs1200 by application of project management concept %B 2008 %9 bucket wheel excavators; maintance management; repair management; project management; %! Improving repair management of bucket wheel excavator SRs1200 by application of project management concept %K bucket wheel excavators; maintance management; repair management; project management; %X The losses resulting from the defect or breakdown of equipment amount to incredible sums, often far higher than the cost of maintenance, repair or reconstruction. It is for this reason that a large number of methods for maintenance and repair of industrial and other plants have been developed. Elaborated in much detail, these methods nevertheless leave a lot of space forimprovement. The improvement is primarily viewed in the context of the management of time, resources and costs of such enterprises. This paper presents a certain concept of project management the implementation of which may improve the maintenance and repair projects. The concept was tested in practice and confirmed in the project of revitalizing of the bucket wheel excavator SRs1200 at MB Kolubara, one of the most complex projects of the kindin the region recently, in terms of technical complexity of reconstruction, the number of participants, the number of activities, cost andtime of realization, as well as other elements of the project. The application of this concept allowed for achieving significant results in the technical and financial fields, which will further be analyzed in detail. %U https://www.sv-jme.eu/article/improving-repair-management-of-bucket-wheel-excavator-srs1200-by-application-of-project-management-concept/ %0 Journal Article %R %& 565 %P 9 %J Strojniški vestnik - Journal of Mechanical Engineering %V 54 %N 7-8 %@ 0039-2480 %8 2017-08-21 %7 2017-08-21
Semolič, Brane, Petar Jovanović, Vladimir Obradović, & Sava Kovačev. "Improving repair management of bucket wheel excavator SRs1200 by application of project management concept." Strojniški vestnik - Journal of Mechanical Engineering [Online], 54.7-8 (2008): 565-573. Web. 20 Dec. 2024
TY - JOUR AU - Semolič, Brane AU - Jovanović, Petar AU - Obradović, Vladimir AU - Kovačev, Sava PY - 2008 TI - Improving repair management of bucket wheel excavator SRs1200 by application of project management concept JF - Strojniški vestnik - Journal of Mechanical Engineering DO - KW - bucket wheel excavators; maintance management; repair management; project management; N2 - The losses resulting from the defect or breakdown of equipment amount to incredible sums, often far higher than the cost of maintenance, repair or reconstruction. It is for this reason that a large number of methods for maintenance and repair of industrial and other plants have been developed. Elaborated in much detail, these methods nevertheless leave a lot of space forimprovement. The improvement is primarily viewed in the context of the management of time, resources and costs of such enterprises. This paper presents a certain concept of project management the implementation of which may improve the maintenance and repair projects. The concept was tested in practice and confirmed in the project of revitalizing of the bucket wheel excavator SRs1200 at MB Kolubara, one of the most complex projects of the kindin the region recently, in terms of technical complexity of reconstruction, the number of participants, the number of activities, cost andtime of realization, as well as other elements of the project. The application of this concept allowed for achieving significant results in the technical and financial fields, which will further be analyzed in detail. UR - https://www.sv-jme.eu/article/improving-repair-management-of-bucket-wheel-excavator-srs1200-by-application-of-project-management-concept/
@article{{}{.}, author = {Semolič, B., Jovanović, P., Obradović, V., Kovačev, S.}, title = {Improving repair management of bucket wheel excavator SRs1200 by application of project management concept}, journal = {Strojniški vestnik - Journal of Mechanical Engineering}, volume = {54}, number = {7-8}, year = {2008}, doi = {}, url = {https://www.sv-jme.eu/article/improving-repair-management-of-bucket-wheel-excavator-srs1200-by-application-of-project-management-concept/} }
TY - JOUR AU - Semolič, Brane AU - Jovanović, Petar AU - Obradović, Vladimir AU - Kovačev, Sava PY - 2017/08/21 TI - Improving repair management of bucket wheel excavator SRs1200 by application of project management concept JF - Strojniški vestnik - Journal of Mechanical Engineering; Vol 54, No 7-8 (2008): Strojniški vestnik - Journal of Mechanical Engineering DO - KW - bucket wheel excavators, maintance management, repair management, project management, N2 - The losses resulting from the defect or breakdown of equipment amount to incredible sums, often far higher than the cost of maintenance, repair or reconstruction. It is for this reason that a large number of methods for maintenance and repair of industrial and other plants have been developed. Elaborated in much detail, these methods nevertheless leave a lot of space forimprovement. The improvement is primarily viewed in the context of the management of time, resources and costs of such enterprises. This paper presents a certain concept of project management the implementation of which may improve the maintenance and repair projects. The concept was tested in practice and confirmed in the project of revitalizing of the bucket wheel excavator SRs1200 at MB Kolubara, one of the most complex projects of the kindin the region recently, in terms of technical complexity of reconstruction, the number of participants, the number of activities, cost andtime of realization, as well as other elements of the project. The application of this concept allowed for achieving significant results in the technical and financial fields, which will further be analyzed in detail. UR - https://www.sv-jme.eu/article/improving-repair-management-of-bucket-wheel-excavator-srs1200-by-application-of-project-management-concept/
Semolič, Brane, Jovanović, Petar, Obradović, Vladimir, AND Kovačev, Sava. "Improving repair management of bucket wheel excavator SRs1200 by application of project management concept" Strojniški vestnik - Journal of Mechanical Engineering [Online], Volume 54 Number 7-8 (21 August 2017)
Strojniški vestnik - Journal of Mechanical Engineering 54(2008)7-8, 565-573
© The Authors, CC-BY 4.0 Int. Change in copyright policy from 2022, Jan 1st.
The losses resulting from the defect or breakdown of equipment amount to incredible sums, often far higher than the cost of maintenance, repair or reconstruction. It is for this reason that a large number of methods for maintenance and repair of industrial and other plants have been developed. Elaborated in much detail, these methods nevertheless leave a lot of space forimprovement. The improvement is primarily viewed in the context of the management of time, resources and costs of such enterprises. This paper presents a certain concept of project management the implementation of which may improve the maintenance and repair projects. The concept was tested in practice and confirmed in the project of revitalizing of the bucket wheel excavator SRs1200 at MB Kolubara, one of the most complex projects of the kindin the region recently, in terms of technical complexity of reconstruction, the number of participants, the number of activities, cost andtime of realization, as well as other elements of the project. The application of this concept allowed for achieving significant results in the technical and financial fields, which will further be analyzed in detail.